- The target was fully achieved. Group wide reporting tool was taken into use. Energy and environmental reporting 2009 was successfully carried out with the new system.
|
Energy efficiency:
- The energy efficiency targets were not met. Most of the production sites have energy efficiency plans and mappings ready but not yet uniformly reported by the end of 2009.
- Specific energy reduction target was not met due to low production levels.
|
Material efficiency:
- Further 10% reduction of waste to landfill per tonne processed achieved.
- Most of the sites have material efficiency or waste reduction schemes. However the most feasible material efficiency plans were not identified at Group level.
|