Goals for 2009

  • Group-wide reporting tool taken into use in 2009.

Energy efficiency:

  • Uniform energy efficiency plans ready at all production sites by the end of 2009.
  • Identification of most important energy efficiency investments at corporate level by the end of 2009 – based on site-specific energy efficiency plans.
  • Reducing specific energy consumption per processed tonne by 2% – base year 2007.

 Material efficiency:

  • Reducing waste to landfill per processed tonne – base year 2007 and further reductions of 10%.
  • Identification of most feasible material efficiency investments at corporate level by the end of 2009 – based on site-specific plans.

Results 2009

  • The target was fully achieved. Group wide reporting tool was taken into use. Energy and environmental reporting 2009 was successfully carried out with the new system.

Energy efficiency: 

  • The energy efficiency targets were not met. Most of the production sites have energy efficiency plans and mappings ready but not yet uniformly reported by the end of 2009.
  • Specific energy reduction target was not met due to low production levels.

Material efficiency:

  • Further 10% reduction of waste to landfill per tonne processed achieved.
  • Most of the sites have material efficiency or waste reduction schemes. However the most feasible material efficiency plans were not identified at Group level.

Goals for 2010

  • Zero significant environmental incidents
  • Reduction of our direct and indirect CO2 emissions in line with the long term target of 20% by 2020.

Energy efficiency:

  • Reducing specific energy consumption per processed tonne by 1% – base year 2007.

Material efficiency:

  • Further reduction of waste to landfill per tonne.